After-sales Service: | 1 Year |
---|---|
Warranty: | 1 Year |
Product Line: | Slitting Machine |
Lines: | 6 |
Voltage: | 220V |
Seals Mode: | Trilateral Seals |
Customization: |
---|
Suppliers with verified business licenses
1. Host frequency conversion speed regulation. 2. Independent control screen, more flexible and convenient operation. 3. Unwinding automatic deviation correction, photoelectric eye tracking can follow the edge or line. 4. Unwinding using air expansion shaft, magnetic powder brake unwinding, automatic tension control. 5. Winding by air expansion shaft (camshaft can be assembled), magnetic powder clutch winding. 6. With waste blowing device. 7. Feeding length automatically meter. 8. Winding and pressing roller make the coil more smooth. 9. Cutting device, flat knife with 8. |
Models |
WFQ-1100B |
WFQ-1300B |
Maximum width of unwinding substrate |
1100mm |
1300m |
Maximum diameter of unwinding |
ф600mm |
ф600mm |
Slitting width range |
50~1100mm |
50~1300mm |
Maximum diameter of winding |
ф450mm |
ф450mm |
Base material coil core diameter |
76mm |
76mm |
Maximum mechanical speed |
180m/min |
180m/min |
Maximum cutting speed |
150m/min |
150m/min |
Rectify the error |
±0.5mm |
±0.5mm |
Total mechanical power |
3.7Kw |
3.7Kw |
Machine weight |
1600kg |
1900kg |
Dimensions (L×W×H) |
1570×2600×1500mm |
1570×2800×1500mm |
This machine is suitable for BOPP, PET, CPP, CPE, PVC, PE, aluminum foil, paper and other roll materials, cutting edge, cutting and so on according to different needs in the production process.
Q1. How to install and operate the machine?
Due to the Global Epidemics we can not send the engineer , will provide the manual and installation video.
After the global epidemic end, The seller will send 1 engineer to install, test the production line and train customers' workers in buyers' factory. It will take 1 week for whole installation and training.
Q2. What should we charge for your engineer?
The buyer should cover engineers' salary, visa cost, round-trip air tickets, accommodations, transportation in buyers' country, food, medical care, safety cost, and related cost happens in buyers' country. Also, the buyer should prepare enough labor, electric wire outside the control panel and tools for installations.
Engineer's salary is USD 80/day, depending on how the engineer make you satisfied. The date he arrives and leaves shall be counted as paid day.
Q3. How long is your machine's warranty period?
Warranty period for the delivered equipment will be 12 months after completion of erection but not later than 18months after shipment. In case any item proves to be defective and the damage is confirmed by seller's technicians within this period, the seller will at their choice either send engineer to repair or supply a new one for replacement free of charge on the basis of CNF delivery.
The above item does not include the parts, which have regular spares or the parts damaged from normal wear, abnormal operation, improper maintenance and inadequate civil works. The seller is not liable for any production loss under any circumstances.
Q4. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time. Engineers will help to take a solution video according your description.
Q5. How do you arrange packing for machine?
As per export standard, they will also be treated before delivery against damage and rusting.
Suppliers with verified business licenses