After-sales Service: | 1 Year |
---|---|
Warranty: | 1 Year |
Product Line: | Plastic Material Valve Bag Making Machine |
Lines: | 6 |
Voltage: | 380V |
Seals Mode: | Trilateral Seals |
Customization: |
---|
Suppliers with verified business licenses
Brief introduction
DC-SC-600VPF fully automatic valve port filling bag making machine is designed for making power material filling bags,which is easily operate.
Functions
This is a multifunctional machine combining from TINUO. It is the best choice for increased capacity and space-saving benefits. It's user friendly ergonomic design, rigid construction with resistant to vibration Recipe and production control system with special PLC system, Easy changeable single and double sealing bar system.
Feature
With vavle bag function.
Model | DC-SC-600VPF |
Filing bag 250-650mm | |
Side seal bag 100-550mm | |
Bottom seal bag 250-500mm | |
width of bag making | Filling bag 250-500mm |
Side seal bag 100-600mm | |
Bottom seal bag100-500mm | |
Speed of bag making | Filling bag 50pcs/min |
side seal bag 80pcs/min | |
bottom seal bag 70pcs/min | |
Side gusset | 30-60mm |
Bottom gusset | 20-50mm(only for side seal bag) |
total power | 11.8kw |
weight of machine | 3100kgs |
overall dimension | 8100x4050x1800 mm |
air compressor | 6.0HP |
Filling Bag: Specially for powder material filling purpose. Moisture proof. Note: There are many kinds valve port filling bag,our machine details from machines we already made before. If you have sample bag,please share me bag photos before quotation. |
Q1. How to install and operate the machine?
Due to the Global Epidemics we can not send the engineer , will provide the manual and installation video.
After the global epidemic end, The seller will send 1 engineer to install, test the production line and train customers' workers in buyers' factory. It will take 1 week for whole installation and training.
Q2. What should we charge for your engineer?
The buyer should cover engineers' salary, visa cost, round-trip air tickets, accommodations, transportation in buyers' country, food, medical care, safety cost, and related cost happens in buyers' country. Also, the buyer should prepare enough labor, electric wire outside the control panel and tools for installations.
Engineer's salary is USD 80/day, depending on how the engineer make you satisfied. The date he arrives and leaves shall be counted as paid day.
Q3. How long is your machine's warranty period?
Warranty period for the delivered equipment will be 12 months after completion of erection but not later than 18months after shipment. In case any item proves to be defective and the damage is confirmed by seller's technicians within this period, the seller will at their choice either send engineer to repair or supply a new one for replacement free of charge on the basis of CNF delivery.
The above item does not include the parts, which have regular spares or the parts damaged from normal wear, abnormal operation, improper maintenance and inadequate civil works. The seller is not liable for any production loss under any circumstances.
Q4. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time. Engineers will help to take a solution video according your description.
Q5. How do you arrange packing for machine?
As per export standard, they will also be treated before delivery against damage and rusting.
Suppliers with verified business licenses