After-sales Service: | 1 Year |
---|---|
Warranty: | 1 Year |
Product Line: | Handle Making Machine |
Lines: | 6 |
Voltage: | 380V |
Seals Mode: | Trilateral Seals |
Customization: |
---|
Suppliers with verified business licenses
This machine mainly supporting semi-automatic paper bag machines. It can produce the round rope handle on line ,and stick the handle on the bag on line too, which can be attached onto the paper bag without handles in further production and make it into paper handbags. This machine takes two narrow paper rolls and one paper rope as raw material, sticks paper belts and paper rope together, which will be cut off gradually to form paper handles. In addition, the machine also has automatic counting and gluing functions, which can greatly improve the efficiency of subsequent processing operations of users.
1) Automatic paper bag machine.
2) Unit equipment design to support.
3) Making paper round rope handle, and attach it to the paper bag.
4) Upgrade it into paper handbags.
5) Feeding material is two roll of slim paper belt with one roll of paper rope.
6) Stick paper rope to flat paper belt, cut them into right size, then stick them to paper bag.
7) Easy to control handle size & length, equipped with auto counter.
8) Perfect after-sales service team to support.
Overall dimension | L6000*W1600*H1500mm |
Motor brand | Longbang geared motor |
Total power | 380V, 10KW, 50HZ |
Servo motor brand | Siemens |
Servo motor power | 750W one group |
PIC programming brand | Siemens |
Hot melt machine brand | Huangshang Taiwan |
Mechanical arm | HIWIN Taiwan |
Handle length | 152mm,190mm |
Paper width | 40mm |
Paper rope length | 360mm |
Paper rope height | 140mm |
Paper gram weight | Best with 100-130g/m2 |
Bag width | 250-450mm |
Bag height | 250-450mm |
Top opening size over 130mm | (Bag width minus the width of folding ) |
Production speed | 33-37pcs/min |
Part Name | Qty | Unit |
Slidder | 2 | SETS |
Mould | 2 | PCS |
Chain | 1 | SETS |
Glue Wheeler | 2 | PCS |
Round Knife | 1 | PCS |
Square Knife | 2 | PCS |
Cutter Wheel | 2 | PCS |
Tool Box | 1 | SETS |
Name | Over all dimension (With the cases) | Gross Weight |
Main machine | 3400*1500*2000mm | 1000kg |
Material holding frame | 2300*1100*2000mm | 3000kg |
Pasting unit | 2250*1250*1650mm | 800kg |
Control box | 1050*650*1350mm | 100kg |
Q1. How to install and operate the machine?
Due to the Global Epidemics we can not send the engineer , will provide the manual and installation video.
After the global epidemic end, The seller will send 1 engineer to install, test the production line and train customers' workers in buyers' factory. It will take 1 week for whole installation and training.
Q2. What should we charge for your engineer?
The buyer should cover engineers' salary, visa cost, round-trip air tickets, accommodations, transportation in buyers' country, food, medical care, safety cost, and related cost happens in buyers' country. Also, the buyer should prepare enough labor, electric wire outside the control panel and tools for installations.
Engineer's salary is USD 80/day, depending on how the engineer make you satisfied. The date he arrives and leaves shall be counted as paid day.
Q3. How long is your machine's warranty period?
Warranty period for the delivered equipment will be 12 months after completion of erection but not later than 18months after shipment. In case any item proves to be defective and the damage is confirmed by seller's technicians within this period, the seller will at their choice either send engineer to repair or supply a new one for replacement free of charge on the basis of CNF delivery.
The above item does not include the parts, which have regular spares or the parts damaged from normal wear, abnormal operation, improper maintenance and inadequate civil works. The seller is not liable for any production loss under any circumstances.
Q4. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time. Engineers will help to take a solution video according your description.
Q5. How do you arrange packing for machine?
As per export standard, they will also be treated before delivery against damage and rusting.
Suppliers with verified business licenses