After-sales Service: | Yes |
---|---|
Warranty: | 1 Year |
Application: | Food |
Power: | Electric |
Automation: | Automatic |
Inflatable Device: | With Inflatable Device |
Customization: |
---|
Suppliers with verified business licenses
1) Polystyrene vacuum chamber and completely stainless steel frame technology ensures a perfect vacuum in a super-powerful room.
2) Thanks to a sensory vacuum system and a touch panel with 6 preset , digital display, 9 memory programs, the extremely easy to use automatic vacuum packing machine allows a maximum vacuum of 99.99% in the storage program.
3) Completely stainless steel frame technology ensures a perfect vacuum in a super-powerful room.
4) There is an extra vacuum in the cooking program that is especially suited to intensifying flavours, aromas, and colours of products intended for sous-vide cooking.
5) Perfectly packages products in bags or in practical, reusable containers. The transparent tempered glass cover allows better product visibility during packing.
Thanks to a sensory vacuum system and a touch panel with 6 preset , digital display ,9 memory programs, the extremely easy to use. Allows a maximum vacuum of 99.99% in the storage program. The floor vacuum packing machine is reasonable in structure, stable in performance and convenient in maintenance. Vacuum packaging machine and improved a lot on the basis of the original, in the product appearance and internal quality etc. are always in the leading position in the market, especially the vacuum we developed the first cover and hinge device reduces the labor intensity of operators.
Model | DC-310H |
Voltage(V/Hz) | 220V/50HZ |
Power(kw) | 0.25KW |
Weight(net) | 22KGS |
Dimension | 410×490×210 MM |
Chamber Size | 355×300×110 MM |
Plastic Plate | 320×220×20 MM |
Chamber volume | 9Liter |
Sealing Bar | 310×6 MM |
Vacuum Pump | 4m3 /h ≥0.09Mpa |
Vacuum oil | ISOVG32--ISOVG68 |
Fresh meat, process meat, sea food, vegetable, agriculture products, tea leaves, herbs, powder pices, prepard food.
Electric parts, hard ware products, medical instruments, medicine cloting and so on.
Benefit
1. Extended shelf life
2. Better presentaion
3. Increased profitability
4. Increased productivity
5. Maintain food's freshness and original flavor
6. Avaliable for sepcial applicant
Q1. How to install and operate the machine?
Due to the Global Epidemics we can not send the engineer , will provide the manual and installation video.
After the global epidemic end, The seller will send 1 engineer to install, test the production line and train customers' workers in buyers' factory. It will take 1 week for whole installation and training.
Q2. What should we charge for your engineer?
The buyer should cover engineers' salary, visa cost, round-trip air tickets, accommodations, transportation in buyers' country, food, medical care, safety cost, and related cost happens in buyers' country. Also, the buyer should prepare enough labor, electric wire outside the control panel and tools for installations.
Engineer's salary is USD 80/day, depending on how the engineer make you satisfied. The date he arrives and leaves shall be counted as paid day.
Q3. How long is your machine's warranty period?
Warranty period for the delivered equipment will be 12 months after completion of erection but not later than 18months after shipment. In case any item proves to be defective and the damage is confirmed by seller's technicians within this period, the seller will at their choice either send engineer to repair or supply a new one for replacement free of charge on the basis of CNF delivery.
The above item does not include the parts, which have regular spares or the parts damaged from normal wear, abnormal operation, improper maintenance and inadequate civil works. The seller is not liable for any production loss under any circumstances.
Q4. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time. Engineers will help to take a solution video according your description.
Q5. How do you arrange packing for machine?
As per export standard, they will also be treated before delivery against damage and rusting.
Suppliers with verified business licenses