After-sales Service: | 1 Year |
---|---|
Warranty: | 1 Year |
Product Line: | Slitting Machine |
Lines: | 6 |
Voltage: | 220V |
Seals Mode: | Trilateral Seals |
Customization: |
---|
Suppliers with verified business licenses
1) Plat steel welding, firmly and balanced, more stable in the high-speed operation.
2) Chromium-plated steel pipe dynamic balance processing.
3) Feeding with 3 inch air shaft, maximum feeding diameter is 1200mm with magnetic powder tension controller and edge automatically align device.
4) Rewinding with 3 inch air snaft and magnetic powder contoller,easy to operate,maximum rewinding diameter is1000mm;rewinding aesthetic and neatly.
5) Cutter can use special blades or flat knife(cutter blades),18mm-3200mm adjustable.
6) Spaindle and circular Knife with CVT system,can be used as high-low speed control and reversing switch control electric speed control system with manual adjustment.convenient and simple to operate.
7) Double-faced diamond with grinding and sharpening system,the grinding wheel lite is up to two years sharpening without disassemble with long life.superior efficiency with dust absorption equipment to maintain the fabric and trackclean.
8) Importing precise ball screw and slides. paralleled promoting the cutting width.importing AC motor step-less adjustment system to adjust and control the cutting speed.high-precise cutting,the accuracy can be controlled within 0.1mm.
9) Standard configuration deviation-checking equipment system to further ensure the utting precision.
10) Chinese and English operation interface with LCD display screens,can direct input.
Item | Specification |
Roller width | 25-1800mm |
Slitting speed | 30-80m/min |
Min slitting width | 25mm |
Power supply | 220V 50Hz |
Total power | 3KW |
Rated power | 3KW |
Overall size | L 2400* W 1800* H950mm |
Weight of Machine | 650KGS (20HQ*1) |
This Non Woven Slitting Machine is special for non woven fabric slitting. Also can slitting BOPP, PET, CPP, PVC and other plastic films.
Q1. How to install and operate the machine?
Due to the Global Epidemics we can not send the engineer , will provide the manual and installation video.
After the global epidemic end, The seller will send 1 engineer to install, test the production line and train customers' workers in buyers' factory. It will take 1 week for whole installation and training.
Q2. What should we charge for your engineer?
The buyer should cover engineers' salary, visa cost, round-trip air tickets, accommodations, transportation in buyers' country, food, medical care, safety cost, and related cost happens in buyers' country. Also, the buyer should prepare enough labor, electric wire outside the control panel and tools for installations.
Engineer's salary is USD 80/day, depending on how the engineer make you satisfied. The date he arrives and leaves shall be counted as paid day.
Q3. How long is your machine's warranty period?
Warranty period for the delivered equipment will be 12 months after completion of erection but not later than 18months after shipment. In case any item proves to be defective and the damage is confirmed by seller's technicians within this period, the seller will at their choice either send engineer to repair or supply a new one for replacement free of charge on the basis of CNF delivery.
The above item does not include the parts, which have regular spares or the parts damaged from normal wear, abnormal operation, improper maintenance and inadequate civil works. The seller is not liable for any production loss under any circumstances.
Q4. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time. Engineers will help to take a solution video according your description.
Q5. How do you arrange packing for machine?
As per export standard, they will also be treated before delivery against damage and rusting.
Suppliers with verified business licenses